AO OKB Zenith has successfully completed a major project for the construction of process equipment systems for the cleaning and preparation of oil on Filanovsky field in the Caspian Sea.

General information about the project

The project customer

OAO LUKOIL

General contractor oilfield construction

 ОАО Globalstroy-Engineering

The subcontractor responsible for the design, manufacture and supply the entire line of process equipment for cleaning and preparation of oil

Fjords Processing Canada Inc.

Technological equipment

Technological equipment includes 2 lines purification and treatment system consisting of identical containers next assignment:

  1.   Two tanks for the first stage of oil separation
  2.    Two tanks for the second stage of oil separation
  3.    Two tanks for the third stage oil separation
  4.    Two electrostatic dehydrators
  5.    Two electrostatic desalters
  6.     Buffer capacity:
  •          two tanks of the first stage of oil separation
  •          two tanks of the second stage of oil separation
  •          two tanks of the third stage of oil separation
  •          two electrostatic dehydrators
  •          two electrostatic desalters
  •          two buffer tanks

The responsibility zone of AO OKB Zenith

  • two tanks of the second stage of oil separation
  • two tanks of the third stage of oil separation
  • two buffer tanks

Project stakeholders

Project structure 

Members of the project team

Procurement stage

Finished goods

Loading of tanks

Successful implementation of such a large cross-cultural international project allowed experts AO OKB Zenit earn competence in managing complex projects and to establish itself as a reliable strategic partner of the company Fjords Processing Canada Inc. for further work on the Russian oilfield services market.