Specialists of AO OKB Zenit on the Severo-Pokachevskoye (LUKOIL)  well put the assembly with 14 hydraulic fracturing ports activated by the balls and successfully carried out all the stages of the fracturing.

Previously, the maximum number of stages of hydraulic fracturing was 11.